OEM / Drawing-led
Work from yourcontrolled drawing.
Start with the geometry, material requirements and inspection points your team has defined.
- You share
- Controlled drawing, critical interfaces, material requirements and expected volume.
- Supplier scope to establish
- Material/formulation selection, applicable mold-development work and sample preparation against your drawing. Identify any geometry change rather than treat it as an approved revision.
- Decision before production
- Does the proposed sample reproduce the controlled component and agreed checks? Confirm unresolved grade or process questions and the commercial order scope separately.
