Factory Tour · Dongkeng, Dongguan
Dongguan foam factory.
Location and process scope.
Customer-supplied factory photographs, alongside our company manufacturing and quality-control scope. Confirm the relevant operation and material for your project.
Talk about your project
01 / Our location
Dongkeng factory and office address.
Our base is in Dongkeng Town, Dongguan, Guangdong.
Our location
Dongguan Silicon Chain New Material Technology Co., Ltd.No.32 Niushikeng Road, Dongkeng Town, Dongguan City, Guangdong Province, China Meet Green Foams
02 / In the workshop
Workshop photographs.
Confirm the operation.
A workshop photo establishes a visual reference, not the material grade, process capability or inspection result for a proposed component.

In the workshop
For a relevant operation, ask us to identify the material or component, equipment purpose, process responsibility and the output being checked. The operation and material in this photograph are not identified here.
Explore capabilities03 / Molding tools
Mold development.
Identify the sample scope.
Mold development and sample preparation are company services. For a proposed tool, request its component and drawing reference, applicable material, sample objective and who performs the work. This photo does not establish those details or tooling ownership.
See our OEM / ODM approach
Company manufacturing scope.
Our company describes the following manufacturing stages. This is not a verified route for every material series or a description of the photographs above.

- 01
Batching & material preparation
Company scope includes formulation design and batching. Confirm which material, formulation and supply form apply to the proposed component.
- 02
Foaming & forming
Company scope includes foaming, molding and shaping. Confirm the relevant route and internal or external responsibility by material; do not infer it from equipment photographs.
- 03
Assembly & testing
Assembly and testing are within the company process description. Request the actual component configuration, check method and available records for your acceptance question.
- 04
Storage & shipment
Finished components move into storage and shipment according to the project's delivery requirements.
Quality through the process
Inspection scope.
Evidence to request.
- Raw-material inspection
- Ask for the material identity, relevant physical-property checks and available record tied to the proposed grade. The company inspection scope does not establish a particular grade result.
- Production process control
- Ask which operation and component features are controlled, how they are checked and what record can be reviewed. Material-specific methods and examples are not established by this tour.
- Finished-product checks
- The stated scope covers physical properties, dimensional accuracy and appearance. Request the applicable method, acceptance criteria and available component record; no inspection report is reproduced here.
